Installation of “CleanGate®”
First we deliver our external stainless-steel-tub. This tub has a rectangular framework the sides of which are adjustable in height at all 4 sides individually.
The framework will be inserted into a prepared pit; its height will be adjusted to ground level and the power supply can be attached through a hole on one of the sides.
Inside the pit the framework rests upon bare brick and screet will be filled up to the base level of the framework (pict. 2).
Next carpet or tiling can be laid outside the framework with a mortice filled with silicone.
Having finished the installation of the framework the cleaning equipment can be mounted (pict. 3 + 4).
CleanGate® is ready for operation now (pict.5).